Update on Revenue Service Frog Testing

As part of its Revenue Service Testing Program, MxV Rail engineers tested the performance of several No. 20 frog surface designs on Norfolk Southern Railway (NS). This long-term study includes testing several different No. 20 frog designs installed on a busy main line of NS track. This Technology Digest provides an update on the third phase of testing. BACKGROUND In 2013, the first phase of testing began with two NS standard frogs and two premium frog systems. The premium test frogs had heavy points, conformal running surface profiles, low-impact or welded heel designs, and elevated guard bars. The outcomes of this initial trial were documented in a previous Technology Digest,1 and the tested frogs have since been retired from service. In the next phase of frog surface design testing, two additional frogs were introduced to the same line in 2017. The second-phase frogs featured a modified heavy point design.2,3 Achieved…